COMPANHIA MINERA SPENCE
Brafer was hired by former Aker Kvaerner in order to manufacture steel structures for the Copper Mining Plant, located in Sierra Gorda, Chile.
In total, 1,750 tons of steel structures were delivered in the middle of the Atacama Desert, a distance of about 4,000 km from Brafer.
The structures were designed from the PDS electronic model, with the detailing made entirely in 3D and reincorporated into the PDS model at the end of the project.