EVONIK
Brafer was contracted by Evonik to supply and assemble 1,900 tons of steel structures, which are divided between the Process and Pipe-rack buildings. Brafer was also responsible for positioning the first large tanks in the buildings.
Evonik is located in Castro, Parana State.