PIPE-RACK – KLABIN
Brafer was hired to manufacture 80 modules for the new Klabin plant – The Puma Project. The project requires a total supply of 2,200 tons of steel structures and fasteners.
Brafer manufactured the heavier pipe-racks for the project and one of the largest ever created in factory. The modules came to weigh 105 tons and measure 29 meters in length.