SEPETIBA PORT


Brafer produced structures for the pier at the Port of Sepetiba, located in Rio de Janeiro.

600 tons were used in the supply and assembly of the boarding bridge. In total, 15 beams were used each weighing 33 tons, with a length of 42 meters, plus locks.

The structures were made of special, corrosion resistant, high durability steel.


Warning: Undefined variable $resultPage in /home/storage/b/28/bb/brafer/public_html/en/paginas/estruturasmetalicas.php on line 484

Warning: Trying to access array offset on value of type null in /home/storage/b/28/bb/brafer/public_html/en/paginas/estruturasmetalicas.php on line 484

Warning: Trying to access array offset on value of type null in /home/storage/b/28/bb/brafer/public_html/en/paginas/estruturasmetalicas.php on line 484