NOVA DUTRA BRIDGE


Brafer was awarded by CCR Nova Dutra to manufacture and assemble a steel structure bridge on the highway. The choice of the company responsible for the concession was due to the construction process speed and the steel structures ability to cover large spans.

The production of the bridge took place in the two Brafer units to meet the contract deadline. The bridge consists of three 40-meter spans, each with four steel beams, which were assembled two by two and weigh 45 tons altogether. The 300 tons of steel structures were assembled under a 440KV high voltage network and with no traffic interdiction.