PIPE RACK – FIBER AND COOKING LINES – KLABIN


Brafer supplied for Andritz, inside the Klabin plant – The Puma Project, Fiber Line Pipe-Rack weighing approximately 400 tons. This structure was fully pre-assembled in the factory, including the pipes and pipe supports that reached 300 tons.

The modules were transported as a single module to the work site, where the module structures were erected one to another with screws and the pipes connected by welding.